Home / Series / Mega Shippers / Aired Order / Season 2 / Episode 4

Wind Turbine Towers | Rockwool, Locomotive | Massive Soil Unload

1). The pressure is on to export three offshore wind towers to safeguard a Scottish town's economic future. 2). A 130-ton locomotive is winched onto a narrow trailer. 3). Massive soil load.

English
  • Originally Aired August 21, 2018
  • Runtime 45 minutes
  • Network Science Channel
  • Created September 9, 2020 by
    Administrator admin
  • Modified July 3, 2023 by
    TVHound