Home / Series / Paddington Station 24/7 / Aired Order / Season 3 / Episode 8

Episode 8

The bank holiday works schedule is disrupted when a trespassers is o the line outside of London, forcing the cancellation of all trains. However, the shutdown allows the engineers onto the track to renew large sections of the rail infrastructure.

English
  • Originally Aired November 5, 2018
  • Runtime 45 minutes
  • Network Channel 5
  • Created October 28, 2018 by
    Administrator admin
  • Modified October 28, 2018 by
    Administrator admin