Home / Series / Salvage Dawgs / Aired Order / Season 8 / Episode 6

Pinehurst Steam Plant

The Dawgs head to Pinehurst, NC, to salvage an old steam plant that used to run the town. After working together to remove an old transom, Grayson and Robert remove some cool valves while Mike discovers some additional salvage in a shed near the building. Back at the shop, Grayson helps build a bar and Robert brings in an unusual find that usually doesn't mesh well with the Dawgs.

English
  • Originally Aired October 1, 2017
  • Runtime 30 minutes
  • Content Rating United States of America TV-G
  • Network DIY Network
  • Created September 22, 2017 by
    Administrator admin
  • Modified September 22, 2017 by
    Administrator admin