Home / Series / This Old House / Aired Order / Season 13 / Episode 8

The Wayland House - 8

Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.

English
  • Originally Aired October 24, 1991
  • Runtime 25 minutes
  • Production Code 1108
  • Network PBS
  • Created January 21, 2018 by
    Administrator admin
  • Modified January 21, 2018 by
    Administrator admin