Home / Series / Mighty Ships / Aired Order / Season 2 / Episode 1
Home / Series / Mighty Ships / Absolute Order / Season 1 / Episode 8

MV Resolution

The first ever purpose built vessel for constructing wind turbines, MV Resolution, docks at Belfast, Northern Ireland to collect turbine components before setting sail for the Robin Rigg Wind Farm in the Solway Firth to assist with its construction.

English français
  • Originally Aired July 29, 2009
  • Runtime 45 minutes
  • Content Rating United States of America TV-G
  • Network Discovery Channel (CA)
  • Created June 4, 2018 by
    Administrator admin
  • Modified June 4, 2018 by
    Administrator admin