Home / Series / The New Yankee Workshop / Aired Order / Season 20 / Episode 3

Kitchen Project - The Hot Wall (3)

The first section Norm builds consists of the cabinets that surround the double oven, range, and range hood. He shows how the existing kitchen will be upgraded and adds a storage organizer. Using a prototype inset door and drawer, he demonstrates how these items will be incorporated into the kitchen. Norm completes the episode by finishing a dovetailed drawer box with a plain front that will be used throughout the kitchen. (Part 3 of 9)

English
  • Originally Aired January 19, 2008
  • Runtime 30 minutes
  • Production Code 0803
  • Network PBS
  • Created May 13, 2015 by
    Administrator admin
  • Modified May 13, 2015 by
    Administrator admin