Home / Series / The Skid Factory / Aired Order / Season 12 / Episode 6

Fabricating Dump Pipes and Melting Holesaws

Today on The Skid Factory, Al & Woody fabricate some side exit Dump Pipes and screamer pipes. Both Turbos are also plumbed with water and oil lines using a bunch of A/N fittings.

English
  • Originally Aired March 10, 2020
  • Runtime 25 minutes
  • Network YouTube
  • Created March 11, 2020 by
    Administrator admin
  • Modified March 11, 2020 by
    Administrator admin