Home / Series / This Old House / Aired Order / Season 26 / Episode 20

Prefab Meets Custom - The Carlisle House

Norm learns how the seamless, clog-less gutter system for the barn is fabricated and installed. Flooring contractor Patrick Hunt shows Kevin how to install a pre-finished engineered cherry floor throughout the first floor of the house. Tom builds the railing system for the barn stairway, while Richard visits a new product design and testing facility for the plumbing industry. Wine cellar contractor Michael Galvin shows Kevin a 3-D fly-through animation of the future wine cellar. At the end of the day, cabinets for the kitchen, pantry, wet bar, and laundry room arrive on a truck from Pennsylvania.

English
  • Originally Aired February 19, 2005
  • Runtime 25 minutes
  • Production Code 2420
  • Network PBS
  • Created August 29, 2015 by
    Administrator admin
  • Modified August 29, 2015 by
    Administrator admin