Tommy calls in an excavator to begin work on the footings for the new porch. Norm meets homeowner Katherine and kitchen designer Linda Cloutier in the new open kitchen to discuss the layout. They head to Linda's showroom to see the cabinet and counter selections. Kevin helps Tommy and his crew frame in the new closet and bathroom for the master suite. On the third floor, in order to fix the ice damage throughout the house, Tommy must first remove all of the old fiberglass insulation. To do this he uses a giant vacuum. Back on the second floor, Norm and Tommy resize an existing door to fit in the smaller opening for the kids' bath.